Showing posts with label River Run Pullover. Show all posts
Showing posts with label River Run Pullover. Show all posts

Tuesday, March 13, 2012

Regressing

After a solid week of fingering-weight, handspun colorwork*, I felt the need to do something waaaay mindless and straightforward.

Tartan socks

Enter toe-up, thick yarn socks, in handspun. Fiber is superwash Corriedale, colorway "Tartan" from Spunky Eclectic. US 5/3.75 mm needles. One sock finished in two short evenings of knitting. Gotta love it**.

* I finished on Saturday afternoon, wrapped it up, and gave it to Himself for his birthday. He was very pleased, and totally unsuspecting. Now I have to find the mental fortitude to weave in all the ends.

** I've also finished the center panel (yay!) and started the border on the SYB, picking up umpteen million stitches around the edge and starting to work in garter stitch. I'll keep going until it's big enough or I get tired of the damn thing.

Thursday, March 8, 2012

So effing close

It's 8:45 pm. At 4:00 pm this afternoon, I ran out of light grey with 1.5 repeats and a cuff left on sleeve #2. Bugger.
Thankfully I had some singles left from the last spin, so I quickly plied, weighed the teensy amount of yarn, soaked it, threw on some dye and hoped for the best.

It's now dry and ready to go. Here's hoping its enough!

ETA 9 March 2012: I gave up at 11:45 last night and went to bed, but...I've got half a repeat and 20 rows of corrugated ribbing to go. This puppy will be done (at least knitting-wise, I make no promises re weaving in 400 bazillion ends or blocking) for the birthday on Saturday. Hooray!

Monday, March 5, 2012

While the cat's away

Yesterday Himself left for a week-long chair building course in Dorset (his Christmas present). I am planning on using this time* to finish the goddamned blankity-blank fracking River Run pullover that I've been working on for more then a year. Because it's his birthday present (please God don't let him pick now to start reading my blog. Kthxbai!) and his birthday is Saturday.

This sweater, while gorgeous beyond all belief, is making me pull my hair out. Because it's taking FOREVER. Nine colors, a 20-something row repeat, and diminishing amounts of handspun, handyed yarn are combining to give me an ulcer. Last night I finished sleeve #1 and promptly celebrated by sticking it in the corner and finishing off the third edge of the sock yarn blanket(now at this stage). The sleeve was five full repeats in total. I am hoping to get one repeat done per night (hahahahahahahahahaha!!!!!) this week and am considering sacrificing one of my children to the All-Powerful Handspinning Gods so that I don't run out of yarn. Because not only will my "schedule" not allow for spinning and dyeing any more, I'm also running out of fiber.

Oy. Thank goodness it's pretty!

River Run detail

* This assumes that the yarn for my sooper sekrit deadline knitting doesn't arrive in the next few days. If it does, Himself will be receiving a sweater with the needles still attached. I'm pretty sure he'll live.

PS - I've finally moved and updated my pattern pages (up there underneath the header) and added the newest pattern - the Southwark Collection (an ebook of my four London-inspired accessories). I've got two more patterns to release this week, so check back for those.

Friday, January 13, 2012

Christmas spinning

The loom did not come as any sort of surprise, and I was so excited by the mere prospect of weaving that three days before Christmas I had the girls pick out some fiber from the stash that I could spin up for scarves for them.

Dev chose some Hello Yarn Shetland fiber that I got from my 4 Oz Challenge prize in 2010, in the colorway "Happy Dance". It ended up like this:

Happy Dance

212 yds/4 oz, 10-14 wpi. I spun this using a point-of-contract draw (i.e. using the twist to pull fibers out from the drafting zone). I ended up with something very squooshy and soft and lovely. After I spun this up I got a bit concerned that it wouldn't hold up to being warp, so I did a little research on how to spin strong warp yarns, which I applied to Boo's scarf yarn.

Boo chose HY Merino in "Overfond".

Overfond

256 yds/4 oz, 8-10 wpi. I spun this worsted (inchworm drafting), with lots of twist, and I'm much more confident in its ability to hold up to weaving strain.

At that point, I was so hopped up on the spinning-for-weaving idea that I jumped into 100 grams of wool/silk blend that I got in a trip down to Guilford to George Weil.

George Weil wool/silk

95 yds/100 grams. Very smooth and dense and gorgeously shiny. I can't wait to weave this up! But I need to do some stash diving to find the right weft yarn for it. Hmmm...

I've also been working on the River Run Pullover again, now that I've got a firm, final, finish-or-be-damned! deadline on it (aka Himself's birthday). I spent yesterday on the couch, recovering from my wicked plague, and working one repeat of the sleeve.


IMG_1721

Ooof. I'm not sure it will ever be done!

Monday, December 12, 2011

There is still knitting for Christmas

It's just that it's stuff I've been knitting over the course of the year. There are a couple of pairs of socks in the gift pile, and a scarf that I made a long time ago but don't ever wear, so it might as well go to a good home. And there's this sweater,

River Run Body

which is only slightly past this stage (shoulders are bound off), but desperately needs a steeking and a neck band ASAP. Like, tonight. Otherwise it's going to turn in to a birthday present three months from now.

I've managed a vest (no pictures yet), and a hat that needs a lining. There's a hat/mittens combo in the works for Devil (one mitten totally done, second mitten outside done (they are lined!), and a hat cast on), but I'm not sure I have enough yarn for them all.

Then there's the things I want to be working on, i.e. spinning up some new fibers to see if I want to carry them in the shop, starting to dye January's fibers, sewing the girls new nightgowns for Christmas Eve. And the things I have to work on, i.e. cooking, cleaning my house for the influx of personages on Thursday and Friday, setting up some things for the girls and I to do because OMG school ends tomorrow at noon. Oh yes, and photographing and getting out not one, not two, but three patterns that are more or less done except for decent pictures.

It's a crazy time of year, that's for sure. Thank goodness there is a full mug in my hands with the chemical structure of caffeine imprinted on the inside (both literally and figuratively).

Friday, March 18, 2011

Process versus product

I been thinking lately about whether process knitting verus product knitting. I think it's fair to claim that I am largely a product knitter - 11 pairs of socks and 11 sweaters as a yearly goal seems to indicate someone who is concerned with the endpoint more then the process. And some of the evidence holds up that conclusion; for example:

Aquaphobia socks and my current book in progress. Luv. Him. To. Death. The socks are pretty good too.


It's barely halfway through the month, and I've got 1.65 socks there. Not too shabby.

But on the other hand, it's T = -4 days to my theoretical River Run deadline, and I've got this:

River Run in progress

The ribbing and almost 2 full pattern repeats of the body chart. That's it. There is no way this sweater is going to be done by the end of the month, much less by the deadline. And I'm ok with that. After deciding that I would enjoy this project rather then rushing through it, I'm finding that I actually am really enjoying it. The way the colors are coming together is working much better then I anticipated, and I really like the semi-arrowhead pattern. I find it very difficult sometimes to translate Fair Isle charts into actual knitting in my mind's eye, and it's always a relief to see what the chart looks like knitted up.

River Run detail

So I guess I'm enjoying my foray into process knitting. It's funny - I'm definitely a process spinner, as evidenced by the whopping pile of handspun sitting up in my guest room, but not so much with the knitting. It's nice to be able to sit down and knit a few rows each night (or each night that I don't fall asleep at 8:30, like last night) and see how the pattern is developing, how the colors blend in to each other, and not feel like I have to keep going when I get tired. Which is good, because with the new addition to the family, I've been getting waaaay less then my usual allotment of sleep. Good things he's so cute...

Image0369

I guess the only two questions now are: when will it get done, and will my Dad like it? I might need to ask him that now before I get too much farther on, I think. If he doesn't like it, he can have something else and this can be IM's 40th birthday present - he's already made approving noises!

Monday, February 21, 2011

The knitting I did on my Spring Vacation

I did this:

February socks in progress

First sock is not finished because I lost the directions somewhere and wasn't sure what to do with the toe. So I put it on an extra needle and started #2

And worked on this, for the few moments I could keep my eyes open in the evening:

River Run ribbing

It's coming along, but oh so slowly! I'm pleased with the way the colors are working out though. So it's all good. Of course, knitting time is about to come to a dramatic halt (with the arrival of the wee dog) or take a large upswing (arrival of the wee dog = "working" from home for a while). We'll see...

Wednesday, February 9, 2011

I which I have a realization

So, on Monday night I wound up all the handspun for the sweater - it took two freakin' hours. Ugh! And then I cast on - 280 stitches on US 1/2.25 mm needles. And I started knitting the ribbing.

Approximately 45 minutes later I'd finished the first row and started the second. Items of interest:

1. Steeking this puppy will be a no brainer because the yarn is a wee bit sticky (understatement of the year that). This is a good thing generally speaking, but it does make for some slow knitting, as I pause to detach the two colors from each other every few stitches.

2. It is a good thing my professional life is not dependent on basic numerical skills, because I can not repeatedly count *two, one, two, one, four*. Because of this inability, I ended my knitting session last night at the same exact point I ended on Monday, having put in double the knitting time. Trying to tink back 200 stitches to fix the colorwork pattern in the Very. First. Row. is just not on. Riiiiiip, redo cast on, try again.

3. I've realized that I have two choices for this project. I can either drive myself (even more) batshit insane rushing through this thing and trying to get it finished in time for the Big Day, or I can enjoy the process of knitting a beautiful sweater for my Dad with yarn that I made and dyed myself, in celebration of the great milestone that is his seventieth birthday. I think I like the second option better...

I'm liking the second option even more given that, in exactly two weeks time, a large portion of my waking and sleeping hours are going to be taken up by the newest member of our family.



Meet the Wee Dog, a (somewhat crosseyed in this picture, but not in real life) Cavalier King Charles Spaniel. Girls are way too excited to even be able to articulate their joy, and I go back and forth between glee and pure abject terror. It feels kind of like when I was pregnant with Devil, in fact. My only saving grace is that housebreaking him is going to happen a lot faster then with the real kids.

Sunday, February 6, 2011

A big pile of handspun

River Run yarn dyed

The River Run yarn, now dyed and ready to be wound up and cast on. I posted the exact dye formulas on Ravelry, but I used jet black, silver gray, gunmetal and navy to get 8 shades (one black, three gray, three blue and one other blue). Now all I've got to do is finish up this:

Dev's purple sweater

February's sweater for Devil. Should be done tonight, if I don't spend too much time winding up handspun.

Wednesday, February 2, 2011

The bonfire and the hamster wheel

Last night I packed up my wheel in the lovely bag my Mom made, got on the Tube, and trekked over to Tricolette for an evening of spinning. When I proposed this excursion to my other half, I said "Guess where I might go with my wheel next week?" His response was "A bonfire?" Ha, ha, bloody ha mate. Just for that, I won't make you any more socks...

The trip on the Tube was actually fine, although I kept waiting for someone to ask me what was in the bag. It helped a great deal that I was going in to town when most people were coming out and the trains were largely empty. I made it there without too many problems, after a trek from the Tube station, and had a lovely evening. A lovely bunch of people, a gorgeous shop (!), and best of all, this is what I was spinning.

All Spun Up Falklands

I was able to start on the Falklands for my mom because this past weekend, I finished up this:

River Run Falklands

Six skeins, ~2100 yds, of 2-ply fingering weight Falklands for the River Run pullover (aka March's sweater). I had an interesting experience with this stuff - the first four skeins I spun over the period of about 2 weeks, and they were in the neighborhood of 1600-1800 ypp. The last two, I did in the last week, and when I finished the first one of the two, it came in at 2100 ypp (435 yds/3.4 oz).

Gulp. Whaaaaa? whimpers

So I plied up the next skein and, instead of soaking it in cold water, soaked it in hot water, with a tiny bit of mussing around. It came out at 1847 ypp. Hmmmmmm, said the curious porpoise, perhaps I can utilize the Falklands-puffball effect to fix that darned first skein. Skein skinny got unwound, thrown in some hot water, and jiggled around a bit. After drying:

400 yds/3.4 oz, 1820 ypp. Done.

I checked the schematics for the pattern, and I fully expect to have to spin up some more yarn somewhere along the line, as the intended recepient of the finished item is both skinny and long*. So I will need to do some veeery scientific dyeing to minimize any dye lot issues with future skeins. But I think it's time to get started with the dye jars. Black, white, three shades of grey, three shades of blue and teal.

Now I need to see if I have enough dye...

* Must remember to find out how long the sleeves have to be...

Friday, January 21, 2011

River Run spinning

As of today (thanks to a one-day work week due to a wicked cold) (and the Australian Open!), I've spun up 1341 yds of 2-ply fingering weight Falklands wool yarn for the Big Colorwork Project. The size I'm knitting calls for:

380 yds black
380 yds medium gray
190 yds white
190 yds light brown
190 yds dark brown
190 yds light gray
190 yds dark gray
190 yds light tan
190 yds medium brown

For a grand total of 2090 yds. Holy crap! I'm more then halfway there! And it's still JANUARY! cue happy dance

I was totally right* about the Falklands-puffball mushroom effect too. Look at this:

Falklands pre- and post-wash

On the left is the freshly plied, unwashed yarn - it is slightly slick, with a nice smooth feel to the yarn. On the right is the washed, thwacked, dried poofy yarn - unbelievably squishable!

The first two totally dry skeins came in at 1484 and 1527 ypp so...still a bit under where they "should" be, but close enough for government work (at least in my experience of government work).

* This happens rarely enough in my fiber adventures that it makes me feel very smug. Which, of course, guarantees that the dyeing is going to be an Utter. Nightmare.