Showing posts with label 11in2011. Show all posts
Showing posts with label 11in2011. Show all posts

Friday, December 23, 2011

Looking back...hahahahahahahahaha!

So I went back and checked my overly optimistic list of goals for the year a few days ago, and that maniacal laughter you heard is what came out of my mouth when I contemplated a) the number of days left in 2011, and 2) the state of the list.

Ehem. Here's what I mean:

1. Eleven pairs of socks - well, I've managed nine pairs. Which is pretty good. Two of those pairs are Christmas presents, three pairs were handspun (which feels a bit like cheating since they're thicker yarn). That will have to do for 2011's sock output. Sadly, I'm not sure my supply of sock yarn has diminished in the slightest.

2. Eleven sweaters, including:
3. Pas de Valse - hahahahahahaha!
4. Handspun Vine Yoke Cardigan - hee hee hee hee hee!
5. Rollneck sweater for Devil - done
6. a handspun River Run Pullover - yarn spun, dyed and sweater started I steeked and knit the neck band this past week, although it took me four tries to get the neckband going the right way. I have also steeked and started the first arm, but yarn supplies are getting low. New goal date for finishing: 10 March 2012.

I did end up with eight finished sweater/vest objects. Including four of my own design (to be fair, three of them are the same sweater with a few variations)(beyond different sizes that is!), one handspun, and one for me. I've also got a pile of handspun yarn begging to be turned in to a sweater and at least one vest in the near future.

7. Spin more during the 2011 Tour de Fleece then I did in 2010 (39.4 oz) - 51.3 oz, 2425 yds, check!

8. Get my first full fleece (figuring out what to do with it is 2012's project) - Weeeeeeeeelll...I have discovered that getting a raw fleece in the UK is not quite so simple as pulling up to the local Sheep and Wool Festival* and throwing down some cash. I'm afraid this one might have to be tabled until we return Stateside.

9. Design a shawl - it's done, and the pattern is written, but I need to weave in the ends/block/photograph the darn thing. Thankfully, it's a freebie pattern, and I'm not getting it test knitted (it is dead easy), so I'm hoping to get that out by the end of the year. I've got delusions of a handspun shawl design too...it has been a bit of a design-filled autumn, though: I've released three patterns in the last couple of months, and have a looming sock pattern that needs to go out the door. And there's one more being tested, and a raft of summery patterns waiting to get out the door. Oy! I'm having fun though...

10. Submit a design to Knitty - submitted to Knitty, got rejected. Submitted to Knitcircus, got rejected, submitted to a book editor, got accepted. Heh heh heh heh... More details on that when it becomes possible - knitting the sample for the book is January's project.

11. Design a spinning/knitting project for Ennea Collective. Eh. Didn't happen. I got busy starting a fiber-dyeing business. But I have grand plans for 2012 (see number 9)...

* My spinning group is going "Whaaaaat local Sheep and Wool Festival?????" I know, I know...

Saturday, December 17, 2011

Ooops!

Meant to blog about this yesterday.

Dev's new sweater
Dev's new sweater

A handspun sweater for Devil, finally photographed
Pattern: Tappan Zee by Amy King, from Knitty
Yarn: handspun Targhee from Hello Yarn, coloway Sprout, about sport weight
Needles: US 4/3.75 mm
Gauge: 6.5 sts/inch
Start/finish: 10 October - 28 November 2011
Modifications: the pattern calls for a heavier weight yarn so I had to do some finagling with the numbers. I knit a swatch (gasp!), got my stitch and row gauge, and plugged some numbers into a spreadsheet to figure out which size to follow from the pattern to get something that would fit her. From that point on it was pretty straightforward knitting from the pattern.

I did work buttonholes all the way down, as requested, and omitted the diamond detail at the bottom. I've got some yarn leftover, so I'm hoping to be able to lengthen it as necessary as she grows.

Dev's new sweater

For the sleeves, I knit straight for about three inches, then decreased two stitches every inch down to about 7 inches at the cuffs, which are finished with a garter stitch band to match the neck and hem. Buttons are yellow hedgehogs found in a shop in York as we were wandering about in the fog.

Dev's new sweater

This is the third time I've knit this pattern, and it's still fun to do. Now I just need to work up one for Boo, and we'll have a matching set in the house. So far the sweater seems to be a huge success. At least it's getting worn a lot! Most gratifying when that happens.

Monday, November 7, 2011

Harpswell Pullover

The Harpswell Pullover pattern is now available.


Harpswell Pullover

This comfy pullover is designed with a crew neck, set-in sleeves and an easy-to-memorize-yet-still-interesting stitch pattern that should satisfy even the most unadventurous of male recipients. The body is worked in the round to the underarms, then split for the front and back. Sleeves are knit in the round to the sleeve cap and then worked back and forth before being seamed into the body of the sweater.


Harpswell Pullover

This pattern ranges in size from 36-60 inches (finished chest measurement) and requires between 1100-2100 yards of worsted weight yarn. More information can be found on the Ravelry pattern page here.



SKILLS REQUIRED

Knitting, purling, increasing and decreasing (both k2tog and ssk), knitting in the round and knitting back and forth, seaming. This pattern is suitable for an advanced beginner.


Harpswell Pullover
$7.00

Many thanks to my test knitters in the Ravelry Free Pattern Testers group, my fabulous model, he-who-must-model-for-me-because-I-knit-him-sweaters-and-he-can't-break-up-with-me (aka my brother), and the lovely JoAnna for her mad photo skills.

Friday, October 21, 2011

FF: Boo's 'andspun socks


Yarn: handspun Cheviot (some details here), approximately DK weight
Needles: US 5/3.75 mm
Start/finish: 6 Oct - 9 Oct 2011 (hooray for large gauge and small feet!)
Comments: a totally plain vanilla sock, toe up, with gusset and heel flap a la Cat Bordhi, with 1x1 ribbing at the top. I knit the first sock until I had used up 48 gr of the 100 gr I started with - I am less stressed out with handspun yarn and socks if I leave a couple of grams leeway for the second sock, since weight is not always an accurate reflection of yardage (particularly the way I spin).

I continue to be a huge fan of Cheviot. Not only was it fun to spin, and the yarn felt softer then the combed top, but the knitted up socks are soft and cushy and springy and just about perfect.

Handspun Boo socks

Boo is very pleased with them. I finished them Sunday morning and she promptly put them on to go for a walk in the Surrey Hills. They are a bit big, so she should be able to wear them for at least this winter. Now it's actually cooling down so that thick, cozy wool socks sound pretty good instead of overwhelming. Hooray for autumn!

Wednesday, October 12, 2011

A week in sweaters, part II

I am so grateful that my kids are still small enough that I can work up a sweater for them in about a week. From the front,

Boo wave sweater

and the back.

Boo wave sweater

Pattern: my own, using the same stitch pattern as in this sweater, but with YOs instead of M1s
Yarn: random worsted weight yarn bought many years ago in Florence, originally grey but we dyed it with fuschia and ended up with purple.
Needles: US 6/4.0 mm
Start/finish: 29 September - 7 October 2011 (that's when it was wearable, not knitting finished)

The story: so I've got this men's sweater pattern that's being test knitted, and one of the testers noted that it would be easy to make it girly by substituting yarn overs for the make ones in the stitch pattern (that syntax would only make sense to other knitters, wouldn't it?). I was intrigued by the idea, but not enthralled to work up another adult sized garment trying it out. Boo had laid claim to this yarn for a sweater for her, so I whipped this up relatively quickly.

Boo wave sweater

The sweater is knit in one piece to the underarm, then split for fronts and back. Sleeves were knit separately and sewn in, the neckband was picked up and knit, and then the button bands. I've had these buttons for ages and they were just the perfect match.

Boo wave sweater

And Boo was a most agreeable little model, although I can't quite manage to get behind the purple lace sweater over pink with white polka dots. So be it.

Monday, October 10, 2011

A week in sweaters, part I

Last week was a big finishing up things week for me. To whit:

Dahlia

Pattern: Dahlia Cardigan by Heather Zoppetti, Interweave Knits Fall 2011
Yarn: Elspeth Lavold Silky Wool (the old version), 65% wool/35% silk, don't know how many skeins, but I'll weigh it and find out
Needles: US 4/3.5 mm
Start/finish: 13 August - 5 October 2011
Comments/modifications: The moment I saw this cardigan, I knew I had to make it. I loved the flowy style, the back panel, the three quarter length sleeves. I even had yarn in stash. So I cast on just before we left for our trip back to the States in August.

I was a bit worried that I would knit the lace panel and then stall out on the stockinette sections. There was a bit of that going on, but it actually made for excellent TV knitting - I had to pay attention enough to get the borders right, but it was mindless after that.

Dahlia

The modifications: well, surprise, surprise, I didn't use the yarn called for in the pattern. Silky Wool (my favorite yarn ever) is listed as a DK weight, but is kind of a light DK, so it worked perfectly for the sportweight yarn recommended by the pattern. The silk gives it a nice nubbly, slightly crunchy texture that I really like knitting with, and it drapes beautifully once it's blocked.

I also used Judy's Magic Cast On instead of the crochet chain provisional cast on (which I despise)(I despise it because I always screw it up and end up having to unpick it stitch by stitch. Always). My lace panel ended up slightly bigger then called for in the pattern, so I adjusted the amount of knitting needed to get to the armholes accordingly. That being said, if I were to do it all over again, I might make the back slightly wider - the afterthought armholes/sleeves mean there isn't any shaping at the shoulders, and it pulled the tiniest bit when I first wore it. Thankfully, it's stretched out a bit now, so it's fine.

Dahlia
No idea why this photo is so washed out/overly bright

I like it with the fronts open and closed - I think it's going to be a very versatile item. I finished it last week in time for Ally Pally, and was very gratified to have someone ask me about it. Hooray for a new fall sweater! And there will be more to come this week. Bwahahahahaha!

Current 2011 sweater tally: Four. Uh oh...I must be forgetting something...

Friday, September 30, 2011

FF: Lincoln Socks

I am feeling a bit like the unblogged projects are piling up and I don't really know where to start. There's so much going on at the moment that blogging is taking a bit of a back seat, so I'm going to try and get some things posted just to keep them straight in my own head.

Handspun Lincoln socks

This is a terrifically craptastic nighttime picture of Dev's new handspun socks, made out of Lincoln that I dyed. Since Lincoln is a longwool, and I didn't want the yarn to feel like twine, I spun the singles at 7.25:1 and then chain plied at 6.5:1 - I'm hoping the length and strength of the fiber will keep these from wearing out too soon.

Pattern is a simple toe-up, short-row heel, worked in k3, p1 rib. I changed to k2, p2 ribbing at the cuff. And I managed to get them on to her feet for an even worse modeled shot.

Dev's handspun socks

Given that it has been extraordinarily warm here recently (they're calling for 28 degrees over the weekend - bliss!) (Also: WTF end of September? This is July weather. Of course, in July we had October weather, so maybe it's all evening out), these babies are destined for the back of the sock drawer for quite a while. Thankfully they're a bit loose, so she shouldn't grow out of them before December.

I hope...

Wednesday, September 28, 2011

Sweater updates

I've been moving along in the sweater-production phase pretty steadily recently. Exhibit 1:

IMG_4200

A finished almost-for-Dad-sweater, which needs to be photographed, packed up, and sent off to the US so I can get my brother to do a photo shoot for me ASAP. I'm hoping to have the pattern available by the middle or end of October. A vest version will follow shortly thereafter.

Exhibit 2:

IMG_4202

Progress being made on sleeve #2 of my Dahlia cardigan A finished Dahlia cardigan being blocked. I had to cannibalize my failed Aleita Shell for the second sleeve, but I'm hoping to have it done by the end of the month it's actually almost done! Left to do: sew up the seams on the back and decide whether or not to make the front panels a bit longer.

Exhibit 3:

IMG_4213

115 yards of dark grey Falklands, for the River Run pullover. This was the one color I messed up on in the dyeing process, by dyeing about half the yardage I actually needed (in my defense, I think that's a boo boo in the yardage requirements in the pattern, but whatever). I spun up another skein pretty quickly, but it took a few days to get the color close enough to work. It's not the same, but there's so much going on in the colorwork, that I'm hoping it will be good enough. But I'm about halfway up the armholes, so I'm feeling like it's moving along. By the end of the current repeat, I should be able to put in the neck steek. And then I'll be almost done with the body!

IMG_4204

It's definitely turning into sweater-knitting weather here (even despite todays 25 plus degrees - WTF September?). I'm already itching to get the next batch on the needles. There's some handspun that needs to be knit up for the girls, and I'm having fits about doing Pas de Valse in overdyed alpaca again, so I might actually have to get going on that. And then there's this to deal with - anybody have any good handspun sweater suggestions?

Monday, September 12, 2011

Who's sweater exactly?

Finally, at long last, I have finished (the knitting on) my Dad's birthday sweater. However, not only is this not the original birthday sweater, it's also not going to go to Dad.

Wave sweater almost done

After my shocking realization that knitting a sweater for my father includes working four feet of sleeves, not including sleeve caps, and the fact that it was a bit closer fitting then I had envisioned, I had to repurpose the whole thing. 'Cause with 1.5 sleeves and an entire body done, there's no way I was going to either trash the thing or rip it back and redo it.

So now it's going to my brother, who only has 21 inches of arm to cover. And who has promised me a photoshoot once he gets it. The plan is to hit publish and go sew in the sleeves. Blocking will commence at 21:00 hours, plus or minus a bit, and it should get into the mail by the end of the week. Hooray for a September sweater!

Monday, August 22, 2011

The dangers of having tall relatives

I was hoping, in some very out-of-touch and theoretical way, to finish a sweater before we left for the States. Then I was hoping to get a lot done on the plane (seeing as how I strategically seated myself away from the rest of my family...), and managed to get through most of the increases on sleeve #2.

Sleeve #2

That was all well and good. And since I got to see the intended recipient, I decided it might be wise to measure his arms and make sure that I'd made the sleeves long enough.

Well. That was a mistake...

I'd knit sleeve #1 to be 18.5 inches long at the underarm, the totally reasonable length suggested by my lovely sweater design software.

My Dad's arms require sleeves that are at least 23 inches long.

Um.

What kind of genetic mutant (no offense Dad!) has arms almost two feet long? It's not like I'm knitting a sweater for Larry Bird, right? Or Michael Phelps?

Suffice to say that my lovely father, having now waited five months for his birthday sweater, is going to have to wait a bit longer. I've got enough yarn, but the last skein is, predictably enough, on top of my washing machine in London. Bah! It's going to be nice though, once it's done...

Wave sweater

Tuesday, August 16, 2011

Travelling

Tomorrow we hop on a plane and head westward for a couple of weeks, so today I have been dealing with the age-old question of which projects to bring. This is a serious consideration - you want to bring a good number and variety of projects so that you don't get bored, but also don't run out of things to do. Running out of knitting might resort to a panic-driven yarn buying spree the likes of which Himself could not forgive! So, I've spent some time thinking about what to bring with me. And here's the pile:

Packing!

Not actually all the bad, given the circumstances. There's the self-designed sweater that needs only a sleeve to be finished (and the pattern needs to go out to testers by Friday, but that's a different problem). This is the key project for tomorrow's7.5 hr flight, and I'm hoping to land in Boston with a mostly finished sleeve.

There's the August socks, which are lagging woefully behind. I was making good progress, but had to rip everything out and start on smaller needles to get something that might vaguely fit my foot. However, that means they're now being knit on US 0/2.0 mm needles. Metal needles. I know they're technically allowed, but given that my last trip with metal pointy sticks resulted in my being held up at security for a while, I think these will be going in the hold instead.

Third up is my guilty project: the Dahlia Cardigan from the latest issue of Interweave Knits. I couldn't help casting on this weekend, but I've finished the interesting bit (the lace panel on the back). I predict that this one is going to languish now that I've hit the stockinette stage, but maybe it will be good car knitting. This one is also on metal needles, so it will get packed in the checked bags. Hopefully TSA is a bit more understanding/less paranoid about metal needles then the Brits, so I can work on it on the way home.

Lastly, I've packed a spinning project: My oldest remaining Hello Yarn Fiber Club stash, from June 2009. This is Shetland in the colorway "Sour Fig". And my trusty Golding spindle. I haven't tried a spindling project on a trip before, and I'm looking forward to it. I think I'm going to try a 6 strand cable with this fiber - three 2-ply yarns plied together. Means I need to split up the fiber by weight before we leave though. Another item for this evening's list.

I'm looking forward to some quality family time, both with the girls and Himself, as well as with various (grand)parents, brothers/sisters (aunts/uncles) and friends. Happy August!

Monday, August 8, 2011

I swear to Bob I'm going to finish a sweater this month

Sadly, but totally unsuprisingly, I've fallen a bit behind in my quest to knit 11 sweaters this year. However, I have high hopes for the month of August!

Wave sweater in progress

That is the body and back, and the start of the front of a manly man sweater. That is going to be for...someone for whom I started a sweater before deciding (with some input from his spouse) that it wasn't quite his thing and I should probably give it to someone who would appreciate it fully. Like my spouse, who has been making goo goo eyes at the thing since I started it, but that's another story.

This yarn was rescued from my abandoned Hurrication vest from the fall of 2008. Intended recipient is a big fan of blue, so I overdyed the yarn with some Jacquard Acid dyes.

Dyelot problems

I've blogged before about my previous attempts to dye sweaterlots of yarn so as to avoid dye lot variability. As you can see from the above picture, it didn't work out so well this time! So I separated out the various shades of blue that I ended up with and re-dyed the seriously lighter ones. I'm knitting the sweater alternating every row or every two rows from two skeins of yarn, in hopes of minimizing any major color differences. It helps that even the darker/brighter skeins have some variability as well. I don't think you can see a difference...

Wave sweater detail

I'm loving the way the stitch pattern looks. When blocked, it flattens out quite a bit, but still keeps that wavey feel. I'm hoping to finish this up in the next couple of weeks, and get the pattern out to testers by the end of this week. Look for this one to be available in early October, just in time for fall knitting!

Monday, June 27, 2011

Admitting defeat in the face of ridiculous odds

Not surprisingly, after the amount of time I spent not knitting this month, my June socks are not going to be done. Sad day. In fact, as of June 21st, they looked like this:

June sock in Kynance Cove

Which is not all that different from how they looked on June 10th, on my way to John O'Groats.

IMAG0050

Oh well, such is life. Recent knitting time has been taken up with teacher gifties - numero uno (which is actually the second one I started) will be finished tonight,

Miss R's scarf

which will let me get back to numero dos, which is about one third done. I'm hoping that garter stitch goes faster then stockinette on this one. The socks will just have to wait for July, and having one sock almost done will hopefully make up for the fact that the Tour de Fleece starts (gulp) this weekend!

Saturday, May 28, 2011

FO: Bright red socks for May

IMG_3645

Pattern: Lanterne Rouge, by yours truly, part of a set of four Tour de France inspired anklets I designed a couple of years ago
Yarn: Cascade Fixation in really, really, really bright red, 1.8 skeins, approximately 180 yds total in the socks.
Needles: US 1/2.25 mm for the foot and heel, US 1.5/2.5 mm for the leg
Start/finish: 1 May - 28 May 2011
Comments/mods: As this is my own pattern, I certainly can't own up to it being anything less then stellar. However, I did modify a few things (and found a few boo boos in the pattern that I'll fix once RAB is over and done with). First off, I knit the medium size for stitch counts, but used the length measurement for the large size. I did this because I was worried that the lace pattern stretchiness might make the size large too loose around the foot.

IMG_3647

I knit the pattern as written for the first sock, tried it on, and realized I needed some adjustments for the leg - it was impossible to get on! So I increased 4 stitches after finishing the heel flap (instead of decreasing) and switched to slightly larger needles. That did the trick.

IMG_3648

Finally instead of making these short, ankle-length socks, I kept going until I was almost out of yarn. I really like how socks made from Fixation fit and feel, but I hate hate hate knitting with it. It hurts my hands like nothing else. Sadly, there are now several partial balls of Fixation in my stash (as well as a couple of whole ones!) that I may just have to get rid of.

So, I am absolutely thrilled that after five months of 2011, I have five finished pairs of socks to show for it. I'm a bit worried that June is going to throw a spanner into the works however, what with this silly 953 mile bike ride I seem to be doing. But I think I've come up with a possible solution: Aran weight socks.

To be fair, using aran weight yarn seems like a huge cop-out, on many different levels. But here's my rationale: for at least 10 days next month (and probably more like 12 or 13), I will be too tired from riding my (lovely new, see in first picture) bike up and down the myriad hills that make up this damned island, or too busy lying on a beach in Cornwall trying to recuperate (please don't let it rain!) to knit a single stitch. And I'm also going to design these socks myself instead of digging in to the pile of SISC bags waiting upstairs (deadline is early July). So that seems fair, doesn't it?

Maybe?

Bueller?

Monday, May 16, 2011

FO: Boo's Elephants

My copy of Interweave Knits Summer 2011 arrived in its belated fashion last week (it goes through a corporate forwarding system from Houston), and as I paged through it the first time, I wasn't so impressed. But the girls were yelling at each other and the dog was chewing on a dirty sock, so I had to leave it and go deal with the chaos. And when I came back, I discovered in the very last section the perfect sweater for Boo, the future veterinarian.

A vest! With elephants! What could be better? So last Thursday I cast on, and today I've got this:

Elephant Baby tank

Pattern: Baby Elephant Vest by Melanie Rice, Interweave Knits Summer 2011
Yarn: Classic Elite Provence, 100% mercerized cotton, 205 yds/100 grams, 2 skeins in a lovely periwinkle that I picked up at the Yarns2Ewe Christmas sale many years ago.
Needles: US 5/3.75 mm and US 6/4.0 mm.
Gauge: ~5 stitches per inch in stockinette on larger needles
Start/finish: 12 May - 16 May 2011
Comments/mods: the modifications were many and huge with this sucker. To start off with, there was no way in hell I was going to get 6.25 stitches/inch with this yarn without making a bullet-proof, stand-up-by-itself sweater. So I threw gauge out the window (always a dangerous idea!), swatched a bit, found a fabric I liked, cast on for the smallest size (21" chest), and hoped for the best. I used the measurements for the Boo-sized sweater (27" chest) for the length to the underarm and the length of the armholes. That was the first major modification. Thankfully, the FO ended up at just about 27", so win-win.

Major modification #2: worked in the round instead of in pieces. I hate seaming, so I did this sucker in the round. I cast on the appropriate number of stitches with 2 extra (for seam stitches), and worked the garter stitch band back and forth. Then when I started the lace pattern I joined to work in the round. The two extra stitches (one on either side) were purled every row to make a nice side seam and to hide the jog that happens with garter stitch in the round.

Elephant side seam

Major modification #3 (which isn't actually so major): instead of casting off and seaming the shoulders, I kept the stitches live and used a three needle bind off to finish. Ta da! No seaming! Well, except for the bit at the hem and the neck band and armhole edges. But still, not too bad...

Elephant 3-needle bind off

Are these not the cutest elephants you've ever seen?

Elephants!

And Boo seems pleased.

So that's May's sweater done. And it's not the one I was planning by a long shot. Maybe this will be a two sweater month???

Saturday, April 30, 2011

At least something got finished in April

With all the rampant starting of projects (and willful ignoring of projects in progress - I'm looking at you River Run), I was sure I would end the month without any finished objects under my belt. Thankfully last week's 9 hours (cumulative) on the train to and from Scotland and a trip from London to Somerset yesterday meant that last night I grafted toe #2 of my April socks while getting all weepy watching Wills and Kate on the BBC1 highlights show last night*.

Finished Nornirs

Pattern: Nornir by Caoua Coffee, the round 2 pattern for Sock Madness 5
Yarn: Woolcraft Superwash Sock Yarn, bought for cheap cheap cheap at my semi-local haberdashery in December
Needles: US 1.5/2.5 mm double points
Start/finish: 1 April - 29 April 2011
Gauge: I am steadfastly ignoring gauge in my socks this year because I'm largely knitting them for other people. These are for someone in the States, and if they don't fit the intended recipient, I'm sure they will find a happy home.
Comments/mods: No mods from the pattern, although I knitted the large (72 stitch) size instead of the smaller version. I guess I originally thought they would be for me, but the slipped stitch/ribbing pattern coupled with a slipped stitch sole makes for a fairly inelastic fabric. They might actually fit me, but they'd probably be a bit tight, so I didn't even try. Off they go for a present instead.

The pattern was very nicely laid out and clearly explained. The stitch patterns used do eat up a fair bit of yarn, and take some time. At least it seemed like it took a long time. The leg is 82 rounds long, but the stitch pattern compresses quite a bit, so they aren't very high.

The bad news: I'm in Somerset, 3+ hours from London, I will be here until Monday, and I don't have the May socks with me. Aaaaaaaaaaaargh!

* I was not terribly in to the whole Royal Wedding TM coverage by any stretch of the information, but was interested to see all the hoopla. Imagine my surprise when I found it all to be actually really wonderful - they were so sweet**, and I thought the whole ridiculous affair was fairly restrained as these things go***. Maybe that's a function of the Veddy British coverage that I watched - what was it like in the States?

** Must give huuuuuge kudos to Mrs. Wales, as the media circus has been unbelievable and I think she's nutso for having agreed to this whole thing in the first place. As an English friend pointed out to me, "Well, she must really love him." Amen.

*** My childhood memories of Charles and Diana's wedding includes a train the length of Westminster Abbey. That might be a wee bit exaggerated, but not as much as I'd like to think.

Thursday, April 28, 2011

Stuck

I have found myself in a bit of a rut recently, hence the general blog silence. Sadly, this is not only a fibery rut, but also a major career rut that I'm trying to work out. There is more to be said on that, but I'm not quite at a point to lay down my thoughts on virtual paper, so it will have to wait. Instead, I will give you some images from our Easter weekend in Edinburgh.

We went hiking on Salisbury Crags in Holyrood Park.

Girls in gorse

We saw some interesting people on the Royal Mile.

Weirdest spinning outfit I've seen yet

I bought a bit of yarn,

IMG_3569

IMG_3567

IMG_3568

and a new ring.

New ring

And I knit most of half a sock in three days.

Nornir 1.5

Life goes on...

Tuesday, April 12, 2011

The perils of faithfulness

So, when last we had any knitting content on this here blog, I was gleefully starting my April socks after many evenings devoted to stranded colorwork, and bemoaning project monogamy.

Ehem. Starting those socks may have been a mistake. Because in the last week I've also cast on for a stashbusting "cat" bed and a new sweater design project. So much for being faithful!

The cat bed is actually for the SRD, who at his vet appointment today, tipped the scales at a whopping 3.13 kg, aka 6.9 lbs.

 Gratuitous cute puppy pic - he was looking at the treat in my hand.
SRD bed

This is kelp's Dotty Cat Bed. I'm using some random recycled grey merino, some leftover Karisma from IM's Aran, the last of the handspun pencil roving from the Northman Mittens and leftover Mountain Mohair from two incarnations of sweater. Excellent for getting rid of ~600 yds of yarn.

Nornir

Socks are still singular, but are on to the gusset. I'm hoping to finish these in time for a May birthday. Hmmm.

River Run

I was about to start the last row before setting the armhole steeks on River Run last night when I realized I'd screwed up the stitch pattern at the beginning of the previous row. Grrrr....tink, tink, tink. After that I was too irritated to keep going on it, so I go the pattern going in the right order again and put it down to turn to this:

QB prototype

The prototype of my newest design. It doesn't look like it, but this is almost ten inches (of 12 needed) of ribbing. In a couple of inches, I get to switch to the lace pattern - yippee! This is going to be a cardigan with a deep scoop neck and elbow length sleeves (or a bit longer) - ribbing to just under the bust with vine lace on the bodice. The yarn is one of my favorites - Elsbeth Lavold Silky Wool in a dark purple. The real life color is much darker then I'm able to get a picture of for some reason. This is a batch I bought in Houston at the Yarns 2 Ewe winter sale right before I started my year-long yarn diet, and is the old formula (65% wool, 35% silk - currently it's 45% wool, 35% silk, 20% nylon). I love this yarn - it's soft to work with, but has a slightly crunchy feel from the silk. And the drape is awesome. I'm hoping to get the lace going tonight, but I've got to get the River Run steeks set first - there's a lot of armhole to go on the March sweater! Not to mention sleeves...

So that the ridiculous number of  active projects I've got on my needles. What about you? Are you a mono- or poly-knitting type? Anyone have more then four active projects going?