I've checked a few things off my list of goals for the year, so I thought I'd give you the progress.
1. Eleven pairs of socks - two months, two pairs of socks from my stash. On track. Yippee!
2. Eleven sweaters, including:
* 3. Pas de Valse
* 4. Handspun Vine Yoke Cardigan
* 5. Rollneck sweater for Devil - done!
* 6. The River Run Pullover, for which I will also spin the yarn - yarn spun, dyed and sweater started.
7. Spin more during the 2011 Tour de Fleece then I did in 2010 (39.4 oz)
8. Get my first full fleece (figuring out what to do with it is 2012's project)
9. Design a shawl
10. Submit a design to Knitty - well, I submitted a design for a kid's top to Knitty for their spring/summer issue, and was very kindly directed elsewhere. So I've done that one, but I probably should have left the target publication a bit more open. In any event, I've also submitted a design to Knitcircus for their fall issue. And I've got another one in the works for a winter coat thing.
11. Design a spinning/knitting project for Ennea Collective.
Strangely enough, there is very little spinning ongoing at the moment - small puppy plus things that spin/dangle string equals frustration all around. So goals 7, 8 and 11 are on hold for a bit. I'm hoping that he figures out that he can't actually chase everything that catches his eye before July though!
and spins and dyes and parents, occasionally works, but is always generally running around like a chicken with her head cut off
Sunday, March 6, 2011
11 in 2011 update
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment