Tuesday, January 19, 2010

How did this happen?

I realized the other day that, according to Ravelry, I've only got two active knitting projects on the needles at the moment. It took me about four hours and much mental anguish to acknowledge that this is, in fact, true. There's the double knitting socks I'm working on for Devil, which are mere rows away from being separated so I can do the toes (I'm definitely not brave enough to try and do those both at the same time). The only other thing actively being worked on is the Sock Yarn Blanket (the crowd goes wild).

To say that it's been a while since this baby got any play is a major understatement. The last blog post about it was here, but no pictures have been posted since almost a year ago. A few nights ago, as I waited for the most recent sampling to dry, I picked it up and got back to work.

A bit of garter stitch was just what I needed after all the math involved in spinning to match a commercial yarn*. The only strenuous bit has been trying to pick out colors, and I'm getting to the point where I'm just going to grab things at random and throw them in. Anything to get this puppy done by the end of February.

The status of the SYB has now gone from this

sock yarn blanket layout 2-4

to this.

SYB 19-1-10.001

There's a chance I might be done by 28 February, but I still haven't figured out how I'm going to fill in those funky little triangles around the edge. Or what to use for the edging. Or the backing, because Boo will be forty two before I finish weaving in all those ends. But the light at the end of the tunnel, if not getting closer, is at least visible from here. And that's progress.

Now I just have to gear up to finish up my Hurricane Vest before spring hits and I'll really feel virtuous.

* If I had had even an inkling of the number of times I would need a calculator for this project, I never would have started spinning, much less spinning for this damn sweater. Never.

No comments: